---
title: To reduce the pre-drying time by 50% with dehumidifying dryer
description: It is difficult to further shorten the molding cycle. However, there is still a lot of room for improvement in the setup time for mold changes.
image: https://eng.injection-molding.jp/hubfs/english/Blog/dehumidifying%20dryer/to%20reduce%20the%20pre-drying%20time%20by%2050%20with%20dehumidifying%20dryer/Blog%EF%BC%9Ato%20reduce%20the%20pre-drying%20time%20by%2050%25%20with%20dehumidifying%20dryer.png
---

- [Gran cutter (Improving the recycling rate)](https://eng.injection-molding.jp/blog/cat/gran-cutter)
- [Total link (Overall improvement in Injection molding line）](https://eng.injection-molding.jp/blog/cat/total-link)
- [Box filling system (Operate for 24 hours and reduce manpower)](https://eng.injection-molding.jp/blog/cat/box-filling-system)
- [EXZⅡ (Reduce mold changing time and take-out time)](https://eng.injection-molding.jp/blog/cat/exz)
- [Dehumidifying dryer (Quality stabilization)](https://eng.injection-molding.jp/blog/cat/dehumidifying-dryer)

[![Home](https://eng.injection-molding.jp/hubfs/ico_home@2x.png)](https://eng.injection-molding.jp/)![](https://eng.injection-molding.jp/hubfs/ico_arrow_right_white@2x.png)[Blog for productivity improvement](https://eng.injection-molding.jp/blog)![](https://eng.injection-molding.jp/hubfs/ico_arrow_right_white@2x.png)To reduce the pre-drying time by 50% with dehumidifying dryer

![To reduce the pre-drying time by 50 with dehumidifying dryer](https://eng.injection-molding.jp/hubfs/english/Blog/dehumidifying%20dryer/to%20reduce%20the%20pre-drying%20time%20by%2050%20with%20dehumidifying%20dryer/Blog%EF%BC%9Ato%20reduce%20the%20pre-drying%20time%20by%2050%25%20with%20dehumidifying%20dryer.png)

It is impossible to further shorten the molding cycle which has reached its limit in today's High-Mix Low-Volume Manufacturing. However, there is still a lot of room for improvement in the setup time for mold changes that we perform every day.

#### There are various processes involved in switching to the next production

- Mold replacement
- Chuck plate replacement
- Material replacement in the injection cylinder dryer, etc.

The most time-consuming of these processes is the **resin pre-drying time.**

## **Problems**

Do you have any following problems?

- When using a hot air dryer, it takes almost 4 hours for pre-drying, especially for nylon-based materials.
- There is no space for a spare dryer and it is costly.
- Unable to mold even though the molds and chuck plates have been replaced.

## Solution

- Change from hot air dryer to dehumidifying dryer.

![dryer-hero1@2x](https://eng.injection-molding.jp/hs-fs/hubfs/english/lp/dryer-lp/dryer-hero1@2x.png?width=192&name=dryer-hero1@2x.png)

[![Go to watch the product page ](https://no-cache.hubspot.com/cta/default/8087610/7dadad92-7149-4807-9ace-b91bd49d5c88.png)](https://cta-redirect.hubspot.com/cta/redirect/8087610/7dadad92-7149-4807-9ace-b91bd49d5c88)

## Result

- Shorten the drying time from taking 4 hours to 2 hours.   
  (It took 4 hours to dry the standard tangerine moisture content of 2800 ppm of 66PA material to the moldable moisture content of 1000 ppm, but now it can be dried in 2 hours.)
- The defect rate was reduced because stable drying was possible without being affected by the season or weather.
- The production efficiency increased by the shortened 2 hours.

## Download document

##### Dehumidifying dryer "MDRⅡ" proposal

Stabilize quality of products and productivity improvement

![Dehumidifying dryer, MDRII-HARMO](https://eng.injection-molding.jp/hs-fs/hubfs/Dehumidifying%20dryer%2c%20MDRII-HARMO.png?width=374&name=Dehumidifying%20dryer%2c%20MDRII-HARMO.png)

[![Download the document of Dehumidifying dryer](https://no-cache.hubspot.com/cta/default/8087610/15350bcc-e4d0-4b51-8e88-4b6c11884892.png)](https://cta-redirect.hubspot.com/cta/redirect/8087610/15350bcc-e4d0-4b51-8e88-4b6c11884892)

Recommended other articles

[![【For Thailand】ไม่จำเป็นต้องปรับตั้งระยะ (หุ่นยนต์หยิบ/จับ)](https://eng.injection-molding.jp/hubfs/english/OGP/%E3%80%90For%20Thailand%E3%80%91%E0%B9%84%E0%B8%A1%E0%B9%88%E0%B8%88%E0%B9%8D%E0%B8%B2%E0%B9%80%E0%B8%9B%E0%B9%87%E0%B8%99%E0%B8%95%E0%B9%89%E0%B8%AD%E0%B8%87%E0%B8%9B%E0%B8%A3%E0%B8%B1%E0%B8%9A%E0%B8%95%E0%B8%B1%E0%B9%89%E0%B8%87%E0%B8%A3%E0%B8%B0%E0%B8%A2%E0%B8%B0%20(%E0%B8%AB%E0%B8%B8%E0%B9%88%E0%B8%99%E0%B8%A2%E0%B8%99%E0%B8%95%E0%B9%8C%E0%B8%AB%E0%B8%A2%E0%B8%B4%E0%B8%9A%E0%B8%88%E0%B8%B1%E0%B8%9A)%20(1).png)

【For Thailand】ไม่จำเป็นต้องปรับตั้งระยะ (หุ่นยนต์หยิบ/จับ)

](https://eng.injection-molding.jp/blog/no-need-for-stroke-adjustmenttake-out-robot-for-thailand) [![How to shorten the cycle time by 30 with servo-driven sprue picker](https://eng.injection-molding.jp/hubfs/english/Blog/exz%E2%85%A1/How%20to%20shorten%20the%20cycle%20time%20by%2030%20with%20servo-driven%20sprue%20picker/Blog%EF%BC%9AHow%20to%20shorten%20the%20cycle%20time%20by%2030%25%20with%20servo-driven%20sprue%20picker.png)

How to shorten the cycle time by 30% with servo-driven sprue picker

](https://eng.injection-molding.jp/blog/how-to-shorten-the-cycle-time-by-30-with-servo-driven-sprue-picker) [![](https://eng.injection-molding.jp/hubfs/english/Blog/For%20Thailand/From%20Pneumatic%20Swing%20Robot%20to%20Servo%20Driven%20Swing%20Robot%EF%BC%884%20major%20advantages%EF%BC%89/Blog%E3%80%90For%20Thailand%E3%80%91From%20Pneumatic%20Swing%20Robot%20to%20Servo%20Driven%20Swing%20Robot(4%20major%20advantages).jpg)

【For Thailand】จากโรบอทสวิงด้วยนิวเมติกมาเป็นโรบอทสวิงด้วยเซอร์โว 2 แกน (ข้อดี 4 ประการ)

](https://eng.injection-molding.jp/blog/from-pneumatic-swing-robot-to-servo-driven-swing-robot-for-thailand)

### Webinar

[![](https://eng.injection-molding.jp/hubfs/english/webinar/webinar%20page/20230510/%E3%80%90For%20Thailand%E3%80%91WebinarReduce%20material%20cost%20with%20Gran%20cutter%E3%81%AE%E3%82%B3%E3%83%94%E3%83%BC.jpg)

2023.04.26

【For Thailand】HARMO's Webinar｜Realize the productivity improvement by shortening take-out time with 2-axis servo driven swing robot

We prepared the suggestions for the people who have problems such as Productivity improvement, Less operation at mold changing, and Ensure the worker's safety.

](https://eng.injection-molding.jp/seminar/20230510_seminar-eng)

[More detail](https://eng.injection-molding.jp/seminar)

### Webinar report

[![](https://eng.injection-molding.jp/hubfs/english/webinar/report/20230510/maxresdefault.jpg)

【For Thailand】HARMO's webinar report｜Realize the productivity improvement by shortening take-out time with 2-axis servo driven swing robot

](https://eng.injection-molding.jp/report/20230510_realize-the-productivity-improvement-by-shortening-take-out-time-with-2-axis-servo-driven-swing-robot) [![](https://eng.injection-molding.jp/hubfs/english/webinar/report/20230213/indonesia%20webinar_23.2.13.jpg)

【For Indonesia】HARMO's webinar report｜Reduce material cost with Gran cutter

](https://eng.injection-molding.jp/report/20230213_for-reduce-material-cost-with-gran-cutter-indonesia) [![](https://eng.injection-molding.jp/hubfs/english/webinar/report/20221208/maxresdefault.jpeg)

【For Vietnam】HARMO's webinar report｜Reduce material cost with Gran cutter

](https://eng.injection-molding.jp/report/20221208_for-reduce-material-cost-with-gran-cutter-vietnam)

[More detail](https://eng.injection-molding.jp/report)

Don't you have problems  
 of Injection molding?

Please consult us about  
automation of production line, productivity improvement, cost and manpower reduction

[![今すぐ相談する](https://no-cache.hubspot.com/cta/default/8087610/64902f4b-b89e-43c8-b75e-2b787023e0a9.png)](https://cta-redirect.hubspot.com/cta/redirect/8087610/64902f4b-b89e-43c8-b75e-2b787023e0a9)

[![資料ダウンロード](https://eng.injection-molding.jp/hubfs/ico_present@2x-1.png)

 Document download

 You can download the document that helps you to improve your production process of Injection molding.

 Document list

](https://eng.injection-molding.jp/document) [![樹脂のサンプルカット](https://eng.injection-molding.jp/hubfs/ico_online@2x-1.png)

 Sample cut (Gran Cutter)

 This is the service of doing sample cut of sprue/runner at Harmo. Please send us your sprues/runners (approximately for 30 shots) to Harmo.

 Request sample cut

](https://eng.injection-molding.jp/lending) [![相談・お問い合わせ](https://eng.injection-molding.jp/hubfs/ico_inquiry@2x-1.png)

Contact HARMO

 From this form, you can consult about products and technologies, and installation. The person in charge will reply within about 2 business days.

 Consult

](https://eng.injection-molding.jp/inquire)

Contact or consult us via phone

[+81-265-73-8820](tel:0265733699)

(9:00 am to 5:00 pm in Japan time)